Monthly Archives: July 2015

The Chronology of PT/35(b): 9 March 1990

9 March 1990 Removal of 5th sample – DP/16 (Crown label n°418) – solder mask scraping – solder mask test) Williamson and Harrower visited Morton International Dynachem Limited in Warrington, after previous telephone contact (according to Robert Linsdell’s statement S5585). … Continue reading

Posted in Chronology, PT/35(b) | 2 Comments

The Chronology of PT/35(b): 8 March 1990

8 March 1990 Control sample laminates tested – continuation of resin test According to Harrower’s statement (AC) and his ch10 CP, after the visit to Ciba Geigy on 8 February he made contact with a number of companies involved in … Continue reading

Posted in Chronology, PT/35(b) | Tagged , | Leave a comment

FLASHBACK: WIKIPEDIA Edited by the CIA

“I cannot confirm that the traffic you cite came from agency computers. CIA Spokesperson (15/08/2007) On this day eight years ago, OMNI (OhmyNewsInternational) published a piece regarding suspicious edits made to certain articles on Wikipedia. As I was researching a … Continue reading

Posted in CIA, Flashback, WIKIPEDIA | Tagged , , , | Leave a comment

The Chronology of PT/35(b): 7 March 1990

7 March 1990 Removal of 4th sample – DP/15 (Crown label n°.417) – sample of copper conducting track Williamson and Harrower attended at Gould Electronics, Southampton, to allow them to examine DP/10, previously removed by Yates, to try and confirm that … Continue reading

Posted in Chronology, PT/35(b) | Leave a comment

The Chronology of PT/35(b): 6 March 1990

6 March 1990 “Other enquiry” i.e. not evidentially significant According to Williamson’s memo of 16 March 1990 to the SIO another of the “other enquiries” that was carried out was a visit to Prestwick Circuits, Ayr (PCB manufacturers) on 6 March 1990. … Continue reading

Posted in Chronology, PT/35(b) | Leave a comment

TIMELINE 1986: The US Embassy in Togo

A reader (Craig M.) has sent me some information that I have decided to include in the 1986 Timeline. The US Ambassador to Togo, Owen W Roberts left one year early of assignment as he “got bored sitting on his … Continue reading

Posted in Timeline, Togo | Tagged | Leave a comment

The Chronology of PT/35(b): 2 March 1990

2 March 1990 Metallurgy test and report. No samples removed Williamson and Harrower attended the Bio-Engineering Dept of Strathclyde University by previous arrangement and met with Dr Rosemary Wilkinson (S5579) (Whitehead in his defence precognition said he recalled suggesting to … Continue reading

Posted in Chronology, PT/35(b) | Tagged | Leave a comment